7 62×37mm Musang - significado y definición. Qué es 7 62×37mm Musang
Diclib.com
Diccionario ChatGPT
Ingrese una palabra o frase en cualquier idioma 👆
Idioma:

Traducción y análisis de palabras por inteligencia artificial ChatGPT

En esta página puede obtener un análisis detallado de una palabra o frase, producido utilizando la mejor tecnología de inteligencia artificial hasta la fecha:

  • cómo se usa la palabra
  • frecuencia de uso
  • se utiliza con más frecuencia en el habla oral o escrita
  • opciones de traducción
  • ejemplos de uso (varias frases con traducción)
  • etimología

Qué (quién) es 7 62×37mm Musang - definición

ROAD IN MALAYSIA
Gua Musang Highway

AD 62         
YEAR
62 AD; 62 (year); Year 62; 62 CE; Events in 62; Births in 62; Deaths in 62
AD 62 (LXII) was a common year starting on Friday (link will display the full calendar) of the Julian calendar. At the time, it was known as the Year of the Consulship of Marius and Afinius (or, less frequently, year 815 Ab urbe condita).
JŽ class 62         
  • JŽ class 62 62-669 as "30075"
YUGOSLAVIAN 0-6-0 SHUNTER
JZ Class 62; JŽ Class 62; JZ class 62
The Jugoslovenske Železnice (JŽ; Yugoslavian Railways) class 62 was a class formed of 106 ex-United States Army Transportation Corps S100 Class steam locomotives, surplus after the Second World War, plus about 90 similar examples built by Đuro Đaković of Slavonski Brod, Croatia between 1952 and 1961.
TLQP-62         
PEPTIDE IN HOMO SAPIENS
Draft:TLQP-62; Draft:TLQP-62 (Peptide); TLQP-62 (Peptide)
TLQP-62 (amino acid 556-617) is a VGF-derived C-terminal peptide that was first discovered by Trani et al. TLQP-62 is derived from VGF precursor protein via proteolytic cleavage by prohormone convertases PC1/3 at the RPR555 site.

Wikipedia

Malaysia Federal Route 8

The Federal Route 8, also known as the Kuala Lumpur–Kota Bharu Highway (Malay: Jalan Kuala Lumpur–Kota Bharu), is a 402.7-km federal highway in Malaysia. It connects Bentong in the south to Kota Bharu in the north. The highway had two parts - Kota Bharu–Kuala Krai Road (Malay: Jalan Kota Bharu–Kuala Krai) and Bentong–Kuala Lipis Road (Malay: Jalan Bentong–Kuala Lipis) until the completion of the missing link from Kuala Krai to Kuala Lipis, causing the entire FT8 highway to take 99 years to be completed.